|
No.
|
Title/Other
Reference/Author/Conference
|
| 2012 | |
| 104 |
Experimental
Results at the CERN Photoemission Laboratory with
Co-deposition Photocathodes in the Frame of the CLIC
Studies E. Chevallay |
| 103 |
A
Segmented Beam Dump for the CTS Line at CTF3 M. Olvegard,W. Andreazza, E. Bravin, N. Chritin, A. Dabrowski, M. Duraffourg, T. Lefèvre |
| 102 |
RF phase stabilization in
CTF3 A. Dubrovskiy |
| 101 |
Comprehensive user manual
for the phase-coding system setup and operation with PHIN
including the measurements performed with the beam M. ‘Csatari’ Divall, A. Andersson, B. Bolzon, E. Bravin, E. Chevallay, S. Döbert, A. Drozdy, V. Fedosseev, C. Hessler, T. Lefèvre, S. Livesley, Ö. Mete, M. Olvegaard, A.N. Rabiller |
|
|
|
| 100 |
Measurement of periodic
optics in the CTF3 combiner ring P.-L. Pernet, S. Bettoni, P. Skowronski, F. Tecker, R. Tomás García, T. Pieloni |
| 099 | The Status of the
Design of the PHIN Spectrometer Line Diagnostics for Time
Resolved Energy Measurements and First Results from 2009 D. Egger, A. Dabrowski, T. Lefèvre |
|
|
|
| 098 |
First Beam Kick
Measurements in the PETS E. Adli, R. Ruber, V. Ziemann |
| 097 |
Techniques for Estimations
of Beam Energy Loss in the Two-beam Test Stand PETS,
applied to the First 12 GHz PETS Tests with Beam E. Adli |
| 096 |
Analysis of the first 12
GHz PETS tests with beam using a constant parameter
recirculation model E. Adli |
| 095 |
Upgrade
Scenarios
for the TBTS R.Corsini, G. Riddone, R. Ruber, V. Ziemann |
| 094 |
Data Analysis for PETS
Recirculation V. Ziemann |
| 093 |
CTF3 3 GHz RF gun test
at CERN G. Bienvenu, H. Braun, E. Chevallay, G. Cheymol, M. Divall, S. Doebert, K. Elsener, V. Fedosseev, A. Ghigo, G. Hirst, M. Joré, N. Lebas, R. Losito, B. Mercier, O. Mete, M. Petrarca, C. Prévost, L. Rinolfi (ed.), R. Roux, A. Variola, C. Vicario |
| 092 |
An Analytical Model for
PETS Recirculation R. Ruber, V. Ziemann |
|
|
|
| 091 | Optics Design of
Transfer Line-2 for CTF3 A. Sharma, A.D. Ghodke, G. Singh, Abdurrahim |
|
|
|
| 090 | Technical
Specification for the Supply of a S-Band Variable
Attenuator G. McMonagle |
| 089 | Cesium-Telluride Photocathode No 166 A. Barbiero, E. Chevallay, K. Elsener, R. Losito |
| 088 | Minutes of CTF3/CALIFES meeting held at CERN on 04 April 2007 |
| 089 | Cesium-Telluride Photocathode No 166 A. Barbiero, E. Chevallay, K. Elsener, R. Losito |
| 088 | Minutes of CTF3/CALIFES meeting held at CERN on 04 April 2007 |
|
|
|
| 087 | Status
of 30 GHz High Power RF Pulse Compressor for CTF3 I. Syratchev |
| 086 | Automatic
Conditioning
on the CTF3 RF System S. Deghaye, A. Dubrovsky, S. Livesley, J. Marques Balula, J. Mourier, J.-M. Nonglaton, J. P. H. Sladen |
| 085 | Progress
on the CTF3 Test Beam Line S. Döbert, D. Carrillo , G. Rumolo, D. Schulte, I. V. Syratchev |
| 084 | Integration
of
the PHIN RF Gun into the CLIC Test Facility S. Döbert |
| 083 | Development
of
a Novel RF Waveguide Vacuum Valve A. Grudiev |
| 082 | Investigations
of
OTR Screen Surfaces and Shapes C.P. Welsch, E. Bravin, T. Lefèvre |
| 081 | High
Dynamic Range Beam Profile Measurements C.P. Welsch, E. Bravin, B. Burel, T. Chapman,T. Lefèvre, M.J. Pilon |
| 080 | Time
Resolved
Spectrometry on the CLIC Test Facility 3 T. Lefèvre, C. Bal, H.H. Braun, E. Bravin, S. Burger, R. Corsini, S. Döbert, C. Dutriat, F. Tecker, P. Urschütz and C.P. Welsch |
| 079 | Minutes
of
Frascati Meeting for the Transfer Line TL1 and the
Combiner Ring of CTF3 N. Chritin, J. Hansen, L. Rinolfi, C. Biscari, G. Fontana, A. Ghigo, V. Lollo, A. Zolla |
| 078 | The
PHIN Photoinjector for the CTF3 Drive Beam R. Losito, G. Bienvenu, H. H. Braun, N. Champault, E. Chevallay, M. Divall, V. Fedosseev, G. Hirst, A. Kumar, G. Kurdi, W. Martin, A. Masi, B. Mercier, I. Musgrave, C. Prevost, I. Ross, R. Roux, E. Springate, G. Suberlucq |
| 077 | On
the
Replacement of the Achromats in a Standard Beam
Observation System at CTF3 by Fused Silica Lenses C.P. Welsch, E. Bravin, T. Lefèvre |
| 076 | Status
Report
of the CTF3 Test Beam Line S. Döbert, D. Schulte, I. Syratchev |
| 075 | Beam
Dynamics
and First Operation of the Sub-Harmonic Bunching
System in the CTF3 Injector P. Urschütz, H. H. Braun, G. Carron, R. Corsini, S. Döbert, T. Lefèvre, G. McMonagle, J. Mourier, J. Sladen, F. Tecker, L.Thorndahl, C. Welsch |
| 074 | Beam
Dynamics
Studies and Emittance Optmization in the CTF3 Linac at
CERN P. Urschütz, H. H. Braun, R. Corsini, S. Döbert, A. Ferrari, F. Tecker |
| 073 | Commissioning
Status
of the CTF3 Delay Loop R. Corsini, D. Alesini , C. Biscari, B. Buonomo, S. Döbert, A. Ghigo, F. Marcellini, B. Preger, M. Serio, A. Stella, F. Tecker, P. Urschütz |
|
072
|
Layout
of
the Long Optimal Lines in CTF3 C.P. Welsch, E. Bravin, T. Lefèvre |
|
071
|
Parameter List of the CTF3
Linac and the CT Line P. Urschütz |
|
|
|
|
070
|
Fast Beam-Ion Instability
in CTF3 S. Döbert |
|
069
|
Instrumentation d'un
Spectromètre de Masse sous Labview J. Sanchez |
|
068
|
The Automatic Steering
System in CTF3 R. Lifshitz, D. Schulte |
|
|
|
|
067 |
Proposal
for
3 GHz Automatic Conditioning in CTF3 A. Dubrovsky, J. Mourier, J.P.H. Sladen |
|
|
First Full Beam Loading Operation
with the CTF3 Linac H. Braun, M. Bernard, G. Bienvenu, G. Carron, R. Corsini, A. Ferrari, O. Forstner, L. Groening, T. Garvey, G. Geschonke, E. Jensen, R. Koontz, T. Lefèvre, R. Miller, L. Rinolfi, D. Schulte, F. Tecker, L. Thorndahl, R. Roux, R. Ruth, D. Yeremian |
|
|
CTF3
Injector Profile Monitor C. Bal, E. Bravin, S. Burger, T. Lefèvre |
|
|
ECL
Counter Crate for CTF3 Precision Timing J.P.H. Sladen |
|
|
Are
Beam Position Corrector Coils in Quadrupole Magnets
helpful? B. Langenbeck |
|
|
Outline
of
DAQ for 30 GHz High Power Processing H.H. Braun, J. Sladen, W. Wuensch |
|
|
Calculation
of
Beam Loss Induced Particle Flux for CTF3 M. Wood |
|
|
|
|
|
Analytical Design of a Confocal
Resonator A. Ferrari, T. Lofnes, V. Ziemann |
|
059
|
Measurement and Calibration of the
Corrector Magnets and the Chicane Dipole Magnets for
CTF3 O. Forstner |
|
058
|
Studies of OTR Angular Distribution
on CTF2 CERN-AB-2003-061, CLIC Note 573, E. Bravin, T. Lefèvre |
|
057
|
OTR from Non-Relativistic Electrons CERN-AB-2003-062, CLIC Note 574, C. Bal, E. Bravin, E. Chevallay, T. Lefèvre, G. Suberlucq |
|
056
|
An Inductive Pick-Up for Beam
Position and Current Measurements CERN-AB-2003-053, CLIC Note 572, M. Gasior |
|
055
|
A New Wide Band Wall Current Monitor CERN-AB-2003-063, CLIC Note 575, P. Odier |
|
054
|
Report
on
the Third Operation of the CTF3 Preliminary Phase in
2002, 16 September - 25 October C. Biscari, R. Corsini, A. Ferrari (Ed.), A. Gallo, A. Ghigo,L. Rinolfi, P. Royer, F. Tecker |
|
053
|
Hardware
of
the CTF3 Beam Position Measurement System |
|
|
|
|
|
Report on the Second Operation
Period of the CTF3 Preliminary Phase in 2002, 27 May -
23 August R. Corsini, A. Ferrari, L. Rinolfi, P. Royer, F. Tecker |
|
|
A 50 Hz Low-Power Solid-State
Klystron-Modulator P. Pearce, L. Sermeus, L. Shen |
|
|
Bunch Compression with the First
Chicane for Linac RF Power Source PS/AE Note 2002-085, O. Forstner |
|
|
Report
on
the Operation of the CTF3 Preliminary Phase, 8
April-24 May 2002 |
|
|
A High Performance Diode-Pumped Nd:YLF
Amplifier M. Csatári, S. Hutchins, I.N. Ross |
|
|
CTF3 Design Report CERN/PS 2002-008 (RF), G. Geschonke |
|
|
Design of a Bunch Phase Monitor for the
CTF3 Preliminary Phase PS/AE/Note 2002-061, A. Ferrari, A. Rydberg |
|
|
PILOT Test Preparation S. Hutchins, G. Suberlucq |
|
|
CTF3 Preliminary Phase Commissioning,
Report on Fifth and Sixth Weeks, 3-14 December 2001 D. Alesini, C. Biscari, R. Corsini, A. Drago, B. Dupuy, A. Ferrari, A. Ghigo, M. Masciarelli, L. Rinolfi, P. Royer (Ed.), M. Scampati, M. Serio, F. Tecker |
|
|
CTF3 Preliminary Phase Commissioning,
Report on Fourth Week, 12-16.11.2001 PS/AE/Note 2002-026, P. Baldini, R. Corsini, B. Dupuy, A. Ferrari, A. Gallo, M. Preger, L. Rinolfi, P. Royer (Editor), F. Tecker |
|
|
CTF3 Project Review,
2-4.10.2001 Copies of transparencies collected by G. Geschonke |
|
|
Prototype "froid" WCM CTF3 : quelques
résultats J. Durand |
|
|
|
|
|
CTF3 Preliminary Phase Commissioning.
Report on Third Week, 29 October - 2 November 2001 PS/AE/Note 2001-020, M. Belli, R. Corsini, B. Dupuy, A. Ferrari, C. Milardi, L. Rinolfi, P. Royer (Ed.), A. Stecchi, F. Tecker |
|
|
CTF3 Design Report - Preliminary
Phase CERN/PS 2001-072 (RF) D. Allard, B. Bartholomé, M. Bernard, J.P. Bertuzzi, G. Bienvenu, R. Bonzano, R. Bossart, H. Braun, E. Bravin, J. Borburgh, J. Buttkus, R. Chaput (LURE), E. Chazarenc, V. Chohan, J.J. Cloye, R. Corsini, G. Coudert, M. Damiani, S. Deghaye, J.P. Delahaye, F. Di Maio, T. Dobers, P. Dubief, B. Dupuy, L. Durieu, A. Ferrari, T. Garvey, J. Hansen, H. Hellgren, M. Hourican, M. Lamidon, J. Le Duff, T. Lefèvre, J.H. Lewis, J. Lindroos, E. Mahner, G. McMonagle, J. Monteiro, J. Mourier, B. Mouton, P. Odier, T. Otto, P. Pearce, R. Pittin, M. Poehler, J-P. Potier, U. Raich, M. Rettig, L. Rinolfi, T. Risselada, R. Riva, G. Rossat, P. Royer, L. Sermeus, K. Setas, G. Simonet, J.P.H. Sladen, L. Søby, L. Tanner, F. Tecker, J.C. Thomi, I. Wilson, G. Yvon |
|
|
Visit to Thales Electron Devices for
Klystron Reception (Upgrade of TH2100 SER.No.040, 37 MW
to 45 MW), 9.11.2001 PS/PO Note 2001-065 (Min.), G. McMonagle |
|
|
CTF3 Preliminary Phase Commissioning -
Report on Second Week, 8-12 October 2001 PS/AE/Note 2001-016 (MD), O. Coiro, R. Corsini, B. Dupuy, F. Marcellini, L. Rinolfi, P. Royer, A. Stella, F. Tecker |
|
|
Report on the Photo-injector Workshop,
CERN, 24-25 September 2001 Summarized by S. Hutchins |
|
|
Specification
for
the Supply of a 1.5 GHz Broadband Klystron or other RF
Power Source for the CLIC Test Facility (CTF3) |
|
|
CTF3 Preliminary Phase Commissioning -
Report on First Week, 17-21 September 2001 PS/AE/Note 2001-014, R. Corsini, B. Dupuy, L. Rinolfi, P. Royer, F. Tecker |
|
|
Technical
Specification
for Solenoid Magnets MS 464 for the CTF3 Injector H. Braun |
|
|
The
Effect of Different Resistor Values on the CTF3
Sub-harmonic Klystron Pulser Simulation Circuit
Performance PS/PO/Note 2001-052 (Tech.), Li Shen |
|
|
Magnets
and
Power Supplies Nomenclature for the Preliminary Phase of
CTF3 PS/AE/Note 2001-013, L. Rinolfi, P. Royer |
|
|
Notes
of
a Visit to TMD Technologies Ltd. on 02.08. 2001
G. McMonagle, P. Pearce |
|
|
Report
of
the Meeting for CLIC Photo-injector Study, 28 June 2001 S. Hutchins |
|
|
Specifications
for
the CTF3 Gun |
|
|
Visit
to Thales Electron Devices (formerly Thomson Tubes
Electronique) on Tuesday, 26th June 2001 |
|
|
Energy
Spread
and Energy Losses in CTF3 Combiner Ring A. Ghigo, M. Zobov |
|
|
The
RF Deflectors for CTF3 D. Alesini, R. Boni, A. Gallo, F. Marcellini |
|
|
Combiner
Ring
Lattice C. Biscari |
|
|
Driving
Beam
Delay Loop Design for CTF3 F. Sannibale |
|
022
|
RF
Power Testing of the Two RF Deflectors for the
Preliminary Phase of the New CLIC Test Facility (CTF3) R. Corsini, G. Rossat, P. Royer |
|
021
|
Proposal
for
CTF3 Timing System J.-C. Bau, J.-M. Bouché, J.H. Lewis, J. Serrano, J.P.H. Sladen |
|
020
|
Production
of
a High Average Current Electron Beam with Cs-Te
Photocathodes E. Chevallay, G. Suberlucq, H. Trautner |
|
019
|
Thermal Analysis of OTR Screens for CTF3 E. Bravin |
|
018
|
LIL
Lattice Parameters, LIL Energy Gains, LIL Temperature
versus RF Frequency, EPA Circumference and EPA
Isochronicity Measurements |
|
|
|
|
017
|
CTF3
Project Information Management Proposal L. Rinolfi, J. Schinzel |
|
016
|
The Solenoids in the Bunching Section of
the LIL CTF3 Injector L.Groening |
|
015
|
Updated
Beam
Dynamics for CTF3 Injector F.Zhou, H.Braun |
|
014
|
Wall
Current
Monitors for CTF3 H-H.Braun, J.Durand |
|
013
|
New
Measurements
of the LIL Bunch Length and Lattice Parameters
PS/LP Note 2000-002 (MD) , R.Corsini, A.Ferrari, L.Rinolfi, T.Risselada, P.Royer, F.Tecker |
|
012
|
Timing
for
CTF3 Preliminary Phase H. Braun, R. Corsini, V. Chohan, S. Deghaye, F. Di Maio, P. Fernier, W. Heinze, H. Hellgren, J. Lewis, G. Métral, R. Pittin, J.P. Potier, L. Rinolfi, J. Serrano, J.P.H. Sladen |
|
011
|
Proceedings of the Third CLIC/CTF3 Collaboration Meeting
CERN, Geneva, Switzerland, 17-19 November 1999 Edited by L.Rinolfi |
|
010
|
Proceedings of the Second CTF3 Collaboration Meeting
CERN, Geneva, Switzerland, 4-9 October 1999 Edited by L.Rinolfi |
|
009
|
LIL
Bunch
Length and Lattice Parameters Measurements in March 2000
PS/LP Note 2000-001 (MD) R.Corsini, A.Ferrari, L.Rinolfi, T.Risselada, P.Royer, F.Tecker |
|
008
|
Technical
description
for the CTF3 gun H.Braun, L.Rinolfi |
|
007
|
Technical
description
for the CLIO gun H.Braun, L.Rinolfi |
|
006
|
Electro-Optical
Beam
Observation S.Hutchins |
|
005
|
Report
of
the Planning meeting for CLIC Photo-Injector Study 23rd
March 2000 S.Hutchins |
|
004
|
Canons
Thermoioniques
pour CTF3 R.Pittin |
|
003
|
Photocathodes
pour
le drive beam du CTF3 et du CLIC, Preparation du test
"mC" dans le canon DC |
|
002
|
Dependence
of
Thermionic Gun Emittance on Beam Energy Calculated with
EGUN L.Groening |
|
001
|
Optimisation
of
the CTF3 injector with 2 SHB's and 3 SHB's H.Braun, F.Zhou |