CTF3 Notes

2000      2001      2002      2003      2004      2005      2006    2007    2008    2009    2010   2012


No.
Title/Other Reference/Author/Conference
2012
104
Experimental Results at the CERN Photoemission Laboratory with Co-deposition Photocathodes in the Frame of the CLIC Studies
E. Chevallay
103
A Segmented Beam Dump for the CTS Line at CTF3
M. Olvegard,W. Andreazza, E. Bravin, N. Chritin, A. Dabrowski, M. Duraffourg, T. Lefèvre
102
RF phase stabilization in CTF3
A. Dubrovskiy
101
Comprehensive user manual for the phase-coding system setup and operation with PHIN including the measurements performed with the beam
M. ‘Csatari’ Divall, A. Andersson, B. Bolzon, E. Bravin, E. Chevallay, S. Döbert, A. Drozdy, V. Fedosseev, C. Hessler, T. Lefèvre, S. Livesley, Ö. Mete, M. Olvegaard, A.N. Rabiller
2010
100
Measurement of periodic optics in the CTF3 combiner ring
P.-L. Pernet, S. Bettoni, P. Skowronski, F. Tecker, R. Tomás García, T. Pieloni
099 The Status of the Design of the PHIN Spectrometer Line Diagnostics for Time Resolved Energy Measurements and First Results from 2009
D. Egger, A. Dabrowski, T. Lefèvre
2009
098
First Beam Kick Measurements in the PETS
E. Adli, R. Ruber, V. Ziemann
097
Techniques for Estimations of Beam Energy Loss in the Two-beam Test Stand PETS, applied to the First 12 GHz PETS Tests with Beam
E. Adli
096
Analysis of the first 12 GHz PETS tests with beam using a constant parameter recirculation model
E. Adli
095
Upgrade Scenarios for the TBTS
R.Corsini, G. Riddone, R. Ruber, V. Ziemann
094
Data Analysis for PETS Recirculation
V. Ziemann
093
CTF3 3 GHz RF gun test at CERN
G. Bienvenu, H. Braun, E. Chevallay, G. Cheymol, M. Divall, S. Doebert, K. Elsener, V. Fedosseev, A. Ghigo, G. Hirst, M. Joré, N. Lebas, R. Losito, B. Mercier, O. Mete, M. Petrarca, C. Prévost, L. Rinolfi (ed.), R. Roux, A. Vari­ola, C. Vicario
092
An Analytical Model for PETS Recirculation
R. Ruber, V. Ziemann
2008
091 Optics Design of Transfer Line-2 for CTF3
A. Sharma, A.D. Ghodke, G. Singh, Abdurrahim
2007
090 Technical Specification for the Supply of a S-Band Variable Attenuator
G. McMonagle
089 Cesium-Telluride Photocathode No 166
A. Barbiero, E. Chevallay, K. Elsener, R. Losito
088 Minutes of  CTF3/CALIFES meeting held  at CERN on 04 April 2007
089 Cesium-Telluride Photocathode No 166
A. Barbiero, E. Chevallay, K. Elsener, R. Losito
088 Minutes of  CTF3/CALIFES meeting held  at CERN on 04 April 2007
2006
087 Status of 30 GHz High Power RF Pulse Compressor for CTF3
I. Syratchev
086 Automatic Conditioning on the CTF3 RF System
S. Deghaye, A. Dubrovsky, S. Livesley, J. Marques Balula, J. Mourier, J.-M. Nonglaton, J. P. H. Sladen
085 Progress on the CTF3 Test Beam Line
S. Döbert, D. Carrillo , G. Rumolo, D. Schulte, I. V. Syratchev
084 Integration of the PHIN RF Gun into the CLIC Test Facility
S. Döbert
083 Development of a Novel RF Waveguide Vacuum Valve
A. Grudiev
082 Investigations of OTR Screen Surfaces and Shapes
C.P. Welsch, E. Bravin, T. Lefèvre
081 High Dynamic Range Beam Profile Measurements
C.P. Welsch, E. Bravin, B. Burel, T. Chapman,T. Lefèvre, M.J. Pilon
080 Time Resolved Spectrometry on the CLIC Test Facility 3
T. Lefèvre, C. Bal, H.H. Braun, E. Bravin, S. Burger, R. Corsini, S. Döbert, C. Dutriat, F. Tecker, P. Urschütz and C.P. Welsch
079 Minutes of Frascati Meeting for the Transfer Line TL1 and the Combiner Ring of CTF3
N. Chritin, J. Hansen, L. Rinolfi, C. Biscari, G. Fontana, A. Ghigo, V. Lollo, A. Zolla
078 The PHIN Photoinjector for the CTF3 Drive Beam
R. Losito, G. Bienvenu, H. H. Braun, N. Champault, E. Chevallay, M. Divall, V. Fedosseev, G. Hirst, A. Kumar, G. Kurdi, W. Martin, A. Masi, B. Mercier,
 I. Musgrave, C. Prevost, I. Ross, R. Roux, E. Springate, G. Suberlucq
077 On the Replacement of the Achromats in a Standard Beam Observation System at CTF3 by Fused Silica Lenses
C.P. Welsch, E. Bravin, T. Lefèvre
076 Status Report of the CTF3 Test Beam Line
S. Döbert, D. Schulte, I. Syratchev
075 Beam Dynamics and First Operation of the Sub-Harmonic Bunching System in the CTF3 Injector
P. Urschütz, H. H. Braun, G. Carron, R. Corsini, S. Döbert, T. Lefèvre, G. McMonagle, J. Mourier, J. Sladen, F. Tecker, L.Thorndahl, C. Welsch
074 Beam Dynamics Studies and Emittance Optmization in the CTF3 Linac at CERN
P. Urschütz, H. H. Braun, R. Corsini, S. Döbert, A. Ferrari, F. Tecker
073 Commissioning Status of the CTF3 Delay Loop
R. Corsini, D. Alesini , C. Biscari, B. Buonomo, S. Döbert, A. Ghigo, F. Marcellini, B. Preger, M. Serio, A. Stella, F. Tecker, P. Urschütz
072

Layout of the Long Optimal Lines in CTF3
C.P. Welsch, E. Bravin, T. Lefèvre
071

Parameter List of the CTF3 Linac and the CT Line
P. Urschütz

2005

070

Fast Beam-Ion Instability in CTF3
S. Döbert
069

Instrumentation d'un Spectromètre de Masse sous Labview
J. Sanchez
068

The Automatic Steering System in CTF3
R. Lifshitz, D. Schulte
2004

067

Proposal for 3 GHz Automatic Conditioning in CTF3
A. Dubrovsky, J. Mourier, J.P.H. Sladen
066
First Full Beam Loading Operation with the CTF3 Linac
H. Braun, M. Bernard, G. Bienvenu, G. Carron, R. Corsini, A. Ferrari, O. Forstner, L. Groening, T. Garvey, G. Geschonke, E. Jensen, R. Koontz, T. Lefèvre,
R. Miller, L. Rinolfi, D. Schulte, F. Tecker, L. Thorndahl, R. Roux, R. Ruth, D. Yeremian
065
CTF3 Injector Profile Monitor
C. Bal, E. Bravin, S. Burger, T. Lefèvre
064
ECL Counter Crate for CTF3 Precision Timing
J.P.H. Sladen
063
Are Beam Position Corrector Coils in Quadrupole Magnets helpful?
B. Langenbeck
062
Outline of DAQ for 30 GHz High Power Processing
H.H. Braun, J. Sladen, W. Wuensch
061
Calculation of Beam Loss Induced Particle Flux for CTF3
M. Wood
2003
060
Analytical Design of a Confocal Resonator
A. Ferrari, T. Lofnes, V. Ziemann
059
Measurement and Calibration of the Corrector Magnets and the Chicane Dipole Magnets for CTF3
O. Forstner
058
Studies of OTR Angular Distribution on CTF2
CERN-AB-2003-061, CLIC Note 573, E. Bravin, T. Lefèvre
057
OTR from Non-Relativistic Electrons
CERN-AB-2003-062, CLIC Note 574, C. Bal, E. Bravin, E. Chevallay, T. Lefèvre, G. Suberlucq
056
An Inductive Pick-Up for Beam Position and Current Measurements
CERN-AB-2003-053, CLIC Note 572, M. Gasior
055
A New Wide Band Wall Current Monitor
CERN-AB-2003-063, CLIC Note 575, P. Odier
054
Report on the Third Operation of the CTF3 Preliminary Phase in 2002, 16 September - 25 October
C. Biscari, R. Corsini, A. Ferrari (Ed.), A. Gallo, A. Ghigo,L. Rinolfi, P. Royer, F. Tecker
053

Hardware of the CTF3 Beam Position Measurement System
M. Gasior

2002
052
Report on the Second Operation Period of the CTF3 Preliminary Phase in 2002, 27 May - 23 August
R. Corsini, A. Ferrari, L. Rinolfi, P. Royer, F. Tecker
051
A 50 Hz Low-Power Solid-State Klystron-Modulator
P. Pearce, L. Sermeus, L. Shen
050
Bunch Compression with the First Chicane for Linac RF Power Source
PS/AE Note 2002-085, O. Forstner
049

Report on the Operation of the CTF3 Preliminary Phase, 8 April-24 May 2002
PS/AE Note 2002-141, A. Corsini, A. Ferrari, L. Rinolfi, P. Royer, F. Tecker

048
A High Performance Diode-Pumped Nd:YLF Amplifier
M. Csatári, S. Hutchins, I.N. Ross
047
CTF3 Design Report
CERN/PS 2002-008 (RF), G. Geschonke
046
Design of a Bunch Phase Monitor for the CTF3 Preliminary Phase
PS/AE/Note 2002-061, A. Ferrari, A. Rydberg
045
PILOT Test Preparation
S. Hutchins, G. Suberlucq
044
CTF3 Preliminary Phase Commissioning, Report on Fifth and Sixth Weeks, 3-14 December 2001
D. Alesini, C. Biscari, R. Corsini, A. Drago, B. Dupuy, A. Ferrari, A. Ghigo, M. Masciarelli, L. Rinolfi, P. Royer (Ed.), M. Scampati, M. Serio, F. Tecker
043
CTF3 Preliminary Phase Commissioning, Report on Fourth Week, 12-16.11.2001
PS/AE/Note 2002-026, P. Baldini, R. Corsini, B. Dupuy, A. Ferrari, A. Gallo, M. Preger, L. Rinolfi, P. Royer (Editor), F. Tecker
042
CTF3 Project Review, 2-4.10.2001
Copies of transparencies collected by G. Geschonke
041
Prototype "froid" WCM CTF3 : quelques résultats
J. Durand
2001
040
CTF3 Preliminary Phase Commissioning. Report on Third Week, 29 October - 2 November 2001
PS/AE/Note 2001-020, M. Belli, R. Corsini, B. Dupuy, A. Ferrari, C. Milardi, L. Rinolfi, P. Royer (Ed.), A. Stecchi, F. Tecker
039
CTF3 Design Report - Preliminary Phase
CERN/PS 2001-072 (RF)
D. Allard, B. Bartholomé, M. Bernard, J.P. Bertuzzi, G. Bienvenu, R. Bonzano, R. Bossart, H. Braun, E. Bravin, J. Borburgh, J. Buttkus, R. Chaput (LURE),
E. Chazarenc, V. Chohan, J.J. Cloye, R. Corsini, G. Coudert, M. Damiani, S. Deghaye, J.P. Delahaye, F. Di Maio, T. Dobers, P. Dubief, B. Dupuy, L. Durieu,
A. Ferrari, T. Garvey, J. Hansen, H. Hellgren, M. Hourican, M. Lamidon, J. Le Duff, T. Lefèvre, J.H. Lewis, J. Lindroos, E. Mahner, G. McMonagle,
J. Monteiro, J. Mourier, B. Mouton, P. Odier, T. Otto, P. Pearce, R. Pittin, M. Poehler, J-P. Potier, U. Raich, M. Rettig, L. Rinolfi, T. Risselada, R. Riva,
G. Rossat, P. Royer, L. Sermeus, K. Setas, G. Simonet, J.P.H. Sladen, L. Søby, L. Tanner, F. Tecker, J.C. Thomi, I. Wilson, G. Yvon
038
Visit to Thales Electron Devices for Klystron Reception (Upgrade of TH2100 SER.No.040, 37 MW to 45 MW), 9.11.2001
PS/PO Note 2001-065 (Min.), G. McMonagle
037
CTF3 Preliminary Phase Commissioning - Report on Second Week, 8-12 October 2001
PS/AE/Note 2001-016 (MD), O. Coiro, R. Corsini, B. Dupuy, F. Marcellini, L. Rinolfi, P. Royer, A. Stella, F. Tecker
036
Report on the Photo-injector Workshop, CERN, 24-25 September 2001
Summarized by S. Hutchins
035

Specification for the Supply of a 1.5 GHz Broadband Klystron or other RF Power Source for the CLIC Test Facility (CTF3)
PS/PO/Note 2001-050 (Spec.), G. McMonagle, P. Pearce

034
CTF3 Preliminary Phase Commissioning - Report on First Week, 17-21 September 2001
PS/AE/Note 2001-014, R. Corsini, B. Dupuy, L. Rinolfi, P. Royer, F. Tecker
033
Technical Specification for Solenoid Magnets MS 464 for the CTF3 Injector
H. Braun
032
The Effect of Different Resistor Values on the CTF3 Sub-harmonic Klystron Pulser Simulation Circuit Performance
PS/PO/Note 2001-052 (Tech.), Li Shen
031
Magnets and Power Supplies Nomenclature for the Preliminary Phase of CTF3
PS/AE/Note 2001-013, L. Rinolfi, P. Royer
030
Notes of a Visit to TMD Technologies Ltd. on 02.08. 2001
G. McMonagle, P. Pearce
029
Report of the Meeting for CLIC Photo-injector Study, 28 June 2001
S. Hutchins
028

Specifications for the CTF3 Gun
H. Braun, G. Geschonke, L. Rinolfi

027

Visit to Thales Electron Devices (formerly Thomson Tubes Electronique) on Tuesday, 26th June 2001
PS/PO Note 2001-032 (Tech.)
G. McMonagle

026
Energy Spread and Energy Losses in CTF3 Combiner Ring
A. Ghigo, M. Zobov
025
The RF Deflectors for CTF3
D. Alesini, R. Boni, A. Gallo, F. Marcellini
024
Combiner Ring Lattice
C. Biscari
023
Driving Beam Delay Loop Design for CTF3
F. Sannibale
022
RF Power Testing of the Two RF Deflectors for the Preliminary Phase of the New CLIC Test Facility (CTF3)
R. Corsini, G. Rossat, P. Royer
021
Proposal for CTF3 Timing System
J.-C. Bau, J.-M. Bouché, J.H. Lewis, J. Serrano, J.P.H. Sladen
020
Production of a High Average Current Electron Beam with Cs-Te Photocathodes
E. Chevallay, G. Suberlucq, H. Trautner
019
Thermal Analysis of OTR Screens for CTF3
E. Bravin
018

LIL Lattice Parameters, LIL Energy Gains, LIL Temperature versus RF Frequency, EPA Circumference and EPA Isochronicity Measurements
R. Corsini, B. Dupuy, A. Ferrari, L. Rinolfi, T. Risselada, P. Royer, F. Tecker

2000
017
CTF3 Project Information Management Proposal
L. Rinolfi, J. Schinzel
016
The Solenoids in the Bunching Section of the LIL CTF3 Injector
L.Groening
015
Updated Beam Dynamics for CTF3 Injector
F.Zhou, H.Braun
014
Wall Current Monitors for CTF3
H-H.Braun, J.Durand
013
New Measurements of the LIL Bunch Length and Lattice Parameters
PS/LP Note 2000-002 (MD) , R.Corsini, A.Ferrari, L.Rinolfi, T.Risselada, P.Royer, F.Tecker
012
Timing for CTF3 Preliminary Phase
H. Braun, R. Corsini, V. Chohan, S. Deghaye, F. Di Maio, P. Fernier, W. Heinze, H. Hellgren, J. Lewis, G. Métral, R. Pittin, J.P. Potier, L. Rinolfi, J. Serrano, J.P.H. Sladen
011
Proceedings of the Third CLIC/CTF3 Collaboration Meeting CERN, Geneva, Switzerland, 17-19 November 1999
Edited by L.Rinolfi
010
Proceedings of the Second CTF3 Collaboration Meeting CERN, Geneva, Switzerland, 4-9 October 1999
Edited by L.Rinolfi
009
LIL Bunch Length and Lattice Parameters Measurements in March 2000
PS/LP Note 2000-001 (MD)
R.Corsini, A.Ferrari, L.Rinolfi, T.Risselada, P.Royer, F.Tecker
008
Technical description for the CTF3 gun
H.Braun, L.Rinolfi
007
Technical description for the CLIO gun
H.Braun, L.Rinolfi
006
Electro-Optical Beam Observation
S.Hutchins
005
Report of the Planning meeting for CLIC Photo-Injector Study 23rd March 2000
S.Hutchins
004
Canons Thermoioniques pour CTF3
R.Pittin
003

Photocathodes pour le drive beam du CTF3 et du CLIC, Preparation du test "mC" dans le canon DC
G.Suberlucq, H.Trautner

002
Dependence of Thermionic Gun Emittance on Beam Energy Calculated with EGUN
L.Groening
001
Optimisation of the CTF3 injector with 2 SHB's and 3 SHB's
H.Braun, F.Zhou


ft Last update: 27.02.2013