CLIC

Notes 1990

No.
Title/Other Reference/Author/Conference
107
Progress report on the CLIC final focus design
17.01.90, O. Napoly, B. Zotter
108
Computer design of iris coupled radio-frequency structures
09.01.90, H. Henke, W. Wuensch
109
Progress on the final focus for CLIC
21.06.90, CERN-SL/90-63 (AP), O. Napoly, B. Zotter
110
Transient eddy currents in a round conductor - a study with ANSYS
26.06.90 AT-MA/MM/PS 90-9 (Internal Note) M. Modena, P. Sievers
111
Signal processing for the CLIC beam position monitor
20.07.90, CERN-SL/90-82 (RFL), J.P.H. Sladen
112
Field quality in single-turn final focus quadrupoles
30.07.90, AT-MA Internal Note 90-13, P. Sievers
113
A micro-movement test facility for CERN linear collider studies (EPAC90)
30.07.90, CERN-SL/90-83 (RFL) , W. Coosemans, I. Wilson ,P. Poirier
114
The fabrication of a prototype 30ÊGHz accelerating section for CERN linear collider studies 30.07.90
CERN-SL/90-84 (RFL), I. Wilson, W. Wuensch, C. Achard
115
Positron production by 2 GeV Electrons in Tungsten 28.06.90, TIS/RP/IR/90-13, M. Höfert , P. Sievers
116
CLIC studies: the dc test bench for laser driven photo-emissive cathodes
07.08.90 CERN/PS 90-24 (LP) Y. Baconnier, K. Geissler, J.H.B. Madsen, A. Pisent, G. Suberlucq
117
Beam dynamics simulations of the RF-gun, particle source of the CLIC test facility
14.08.90, CERN/PS 90-23 (LP) , H. Kugler, A. Pisent, A.J. Riche, J. Ströde
118
Alignement initial du CLIC 17.08.90 W. Coosemans
119
The CERN Linear Collider Test Facility
10.09.90 CERN/PS 90-55 (LP) Y. Baconnier, R. Bossart, K.K. Geissler, J.C. Godot, K. Hübner, H. Kugler, J.H.B. Madsen, A.J. Riche, J. Ströde, G. Suberlucq
120
Revised parameters for the CLIC main linac accelerating structure
20. 09.90, I. Wilson, W. Wuensch
121
RF characteristics of a 30 cell prototype accelerating section for CLIC
20.09.90, I. Wilson, W. Wuensch
122
Microwave measurement techniques for CLIC main linac accelerating structures
20.09.90 CERN SL/90-103 (RFL), I. Wilson, W. Wuensch
123
Status of CERN Linear Collider Studies
21.09.90 CERN-SL/90-100 (AP), (Linac 90), G. Guignard
124
The CERN Study of an Electron-Positron Collider in the TeV Range
24.09.90, CERN-SL/90-101 (RFL), W. Schnell
125
The proposed beam optics for the CLIC Test Facility and the instrumentation layout
31.08.90, PS-LP(CTF) Note 90-29 (Rev.), A.J. Riche
126
An asthenon factory and a top factory on the way to a TeV fully superconducting linear collider
07.11.90, CERN-PPE/90-162, U.Amaldi
127
Energy spread compensation in CLIC
11.90, CERN-SL/90-122 (BI/AP), C. Fischer, G. Guignard
128
Compensation of single bunch transverse beam breakup in a chain of long periodic linac cavities
17.10.90, R.L. Gluckstern
129
The CLIC Final Focus System for the revised CLIC parameters
30.10.90, O. Napoly, B. Zotter
130
Computation of design parameters for a pulsed quadrupole in the 2D-transient skin effect regime
12.90, CERN/AT, 90-22 (MA), M.Modena, P. Sievers
 
 


| 1985 | 1986 | 1987 | 1988 | 1989 | 1991 | 1992 | 1993 | 1994 | 1995 | 1996 | 1997 | 1998 | 1999 | 2000 | 2001 | 2002 | 2003 | 2004 | 2005 |

| Welcome | Table of Contents | Overall Layouts | Minutes |