
|
No.
|
Title/Other Reference/Author/Conference
|
|
107
|
Progress report on the CLIC final focus design 17.01.90, O. Napoly, B. Zotter |
|
108
|
Computer design of iris coupled radio-frequency structures 09.01.90, H. Henke, W. Wuensch |
|
109
|
Progress on the final focus for CLIC 21.06.90, CERN-SL/90-63 (AP), O. Napoly, B. Zotter |
|
110
|
Transient eddy currents in a round conductor - a study with ANSYS 26.06.90 AT-MA/MM/PS 90-9 (Internal Note) M. Modena, P. Sievers |
|
111
|
Signal processing for the CLIC beam position monitor 20.07.90, CERN-SL/90-82 (RFL), J.P.H. Sladen |
|
112
|
Field quality in single-turn final focus quadrupoles 30.07.90, AT-MA Internal Note 90-13, P. Sievers |
|
113
|
A micro-movement test facility for CERN linear collider studies
(EPAC90) 30.07.90, CERN-SL/90-83 (RFL) , W. Coosemans, I. Wilson ,P. Poirier |
|
114
|
The fabrication of a prototype 30ÊGHz accelerating section for
CERN linear collider studies 30.07.90 CERN-SL/90-84 (RFL), I. Wilson, W. Wuensch, C. Achard |
|
115
|
Positron production by 2 GeV Electrons in Tungsten 28.06.90, TIS/RP/IR/90-13, M. Höfert , P. Sievers |
|
116
|
CLIC studies: the dc test bench for laser driven photo-emissive
cathodes 07.08.90 CERN/PS 90-24 (LP) Y. Baconnier, K. Geissler, J.H.B. Madsen, A. Pisent, G. Suberlucq |
|
117
|
Beam dynamics simulations of the RF-gun, particle source of the
CLIC test facility 14.08.90, CERN/PS 90-23 (LP) , H. Kugler, A. Pisent, A.J. Riche, J. Ströde |
|
118
|
Alignement initial du CLIC 17.08.90 W. Coosemans |
|
119
|
The CERN Linear Collider Test Facility 10.09.90 CERN/PS 90-55 (LP) Y. Baconnier, R. Bossart, K.K. Geissler, J.C. Godot, K. Hübner, H. Kugler, J.H.B. Madsen, A.J. Riche, J. Ströde, G. Suberlucq |
|
120
|
Revised parameters for the CLIC main linac accelerating structure
20. 09.90, I. Wilson, W. Wuensch |
|
121
|
RF characteristics of a 30 cell prototype accelerating section
for CLIC 20.09.90, I. Wilson, W. Wuensch |
|
122
|
Microwave measurement techniques for CLIC main linac accelerating
structures 20.09.90 CERN SL/90-103 (RFL), I. Wilson, W. Wuensch |
|
123
|
Status of CERN Linear Collider Studies 21.09.90 CERN-SL/90-100 (AP), (Linac 90), G. Guignard |
|
124
|
The CERN Study of an Electron-Positron Collider in the TeV Range
24.09.90, CERN-SL/90-101 (RFL), W. Schnell |
|
125
|
The proposed beam optics for the CLIC Test Facility and the instrumentation
layout 31.08.90, PS-LP(CTF) Note 90-29 (Rev.), A.J. Riche |
|
126
|
An asthenon factory and a top factory on the way to a TeV fully
superconducting linear collider 07.11.90, CERN-PPE/90-162, U.Amaldi |
|
127
|
Energy spread compensation in CLIC 11.90, CERN-SL/90-122 (BI/AP), C. Fischer, G. Guignard |
|
128
|
Compensation of single bunch transverse beam breakup in a chain
of long periodic linac cavities 17.10.90, R.L. Gluckstern |
|
129
|
The CLIC Final Focus System for the revised CLIC parameters 30.10.90, O. Napoly, B. Zotter |
|
130
|
Computation of design parameters for a pulsed quadrupole in the
2D-transient skin effect regime 12.90, CERN/AT, 90-22 (MA), M.Modena, P. Sievers |