
|
No.
|
Title/Other Reference/Author/Conference
|
|
187
|
High Gradient Testing of an 11.4 GHz accelerating structure for
KEK/CERN Linear Collider Studies, 25.02.93 T. Higo, T. Taniuchi, M. Yamamoto, J. Odagiri, S. Tokumoto H. Mizuno - KEK and I. Wilson, W. Wuensch - CERN |
|
188
|
Structure scaling with RF Frequency and Betatron scaling with
energy in CLIC, 26.02.93, CERN/SL 93-12 (AP), G. Guignard |
|
189
|
Measurement of the Precision of a CLIC Beam Position Monitor 12.03.93 , J.P.H. Sladen, W. Wuensch |
|
190
|
Simulation of the CLIC Transfer Structure by Means of MAFIA San
Francisco Conf. Feb.'93, 23.03.93 CERN/SL 93-18 (CO) A. Millich |
|
191
|
Measurements of Seismic Vibrations in the CERN TT2A Tunnel for
Linear Collider Studies 06.04.93, CERN/SL 93-30 (RFL) V.E. Balakin, V.M. Juravlev, A.A. Sery, A.I. Sleptsov, Yu.D. Valiaev W. Coosemans, G. Ramseier, I. Wilson, V. Lawson-Chroco |
|
192
|
Transverse Stability in Multibunch Mode for CLIC 1993 Particle
Accelerator Conference, Washington, May 1993 06.04.93 CERN-SL/93-20 (DI), G. Guignard |
|
193
|
Lattice Scaling and Emittance Control in the CLIC Main Linac 1993
Particle Accelerator Conference, Washington, May 1993 06.04.93 CERN-SL/93-20 (DI), G. Guignard |
|
194
|
Multibunching Studies for CLIC 1993 Particle Accelerator Conference,
Washington, May 1993 23.04.93, CERN-SL/93-20 (DI), I. Wilson, W. Wuensch |
|
195
|
The CERN Linear Collider 1993 Particle Accelerator Conference,
Washington, May 1993 23.04.93, CERN-SL/93-20 (DI), the CLIC Study Group |
|
196
|
Loss of Precision in Resonant Beam Position Monitor due to finite
Q 1993 Particle Accelerator Conference, Washington, May 1993 15.05.93, CERN-SL/93-20 (DI) , J.P.H. Sladen, W. Wuensch |
|
197
|
CLIC Transfer Structure (CTS) Simulations Using MAFIA 1993 Particle
Accelerator Conference, Washington, May 1993 15.05.93 CERN-SL/93-20 (DI), A. Millich |
|
198
|
Global Trajectory Correction Algorithms in CLIC and main Linac
Alignment Tolerances 1993 Particle Accelerator Conference, Washington, May 1993 15.05.93, CERN-SL/93-20 (DI), C. Fischer |
|
199
|
The Work at CERN towards an e+e- Linear Collider ICFA Seminar
on Future Perspectives in High Energy Physics at DESY, Hamburg, May 3-7, 1993 15.05.93, W. Wuensch |
|
200
|
RF Hardware Development Work for the CLIC Drive Beam 1993 Particle
Accelerator Conference, Washington, May 1993 15.05.93 CERN-SL/93-20 (DI), G. Carron, L. Thorndahl |
|
201
|
List of CLIC Notes 13.07.93, P. Martucci |
|
202
|
Drive Beam Generator by induction Linac and FEL experimental studies
for the CERN Linear Collider 26.05.93 CERN/PS 93-21 (LP), R. Corsini, J. Gardelle, J. Grenier, C.D. Johnson |
|
203
|
Photocathodes Tested in the DC Gun of the CERN Photoemission Laboratory 07.06.93, CERN/PS 93-22 (LP), E. Chevallay, J. Durand, S. Hutchins, G. Suberlucq, M. Wurgel |
|
204
|
Transverse Wake Field in the CLIC Transfer Structure 1993 Particle
Accelerator Conference, Washington, May 1993 10.06.93 CERN/SL 93-20 (DI), G. Guignard, G. Carron, A. Millich, L. Thorndahl |
|
205
|
MAFIA Simulation of the Multicell RF Gun for the CLIC Test Facility
06.07.93, CERN/SL 93-27 (RF), S. Lutger |
|
206
|
Modular RF Gun consisting of 2 RF Sections and an Intermediate
Focusing Solenoid 18.06.93 CERN/PS 93-26 (RF), R. Bossart |
|
207
|
Present status and Future of the CERN Linear Collider Test Facility
(CTF) Workshop on High Intensity Electron Sources, Legnaro Padova, Italy - 24-28
May 1993 05.07.93 CERN/PS 93-32 (LP) J.P. Delahaye, J.H.B. Madsen, A. Riche, L. Rinolfi |
|
208
|
Linear Collider Development at CERN Paper presented at the 2nd
International Workshop on Physics and Experiments with Linear e+e- Colliders Waikoloa,
Hawaii, April 26-30, 1993 09.07.93 CERN/SL 93-31 (AP), G. Guignard |
|
209
|
Pulse Train Generation at 209 NM 26.07.93 CERN/PS 93-34(LP), P.M. Devlin-Hill |
|
210
|
Crab Collision for the CLIC Final Focus 20.09.93, J. Hagel, B. Zotter |
|
211
|
Measurements of the Short Bunch Length in the CLIC Test Facility
(CTF) 27.09.93, CERN/PS 93-40 (BD), S. Battisti |
|
212
|
CLIC Drive Beam Generation Scheme based on FEL Bunching
and RF Accelerator 22.09.93, J.P. Delahaye |
|
213
|
A multi-frequency acceleration for the CLIC drive linac with beam
loading and HOM compensation 22.09.93, L. Thorndahl |
|
214
|
Cancelled |
|
215
|
Another View on Beam Stability, Alignment and possible Luminosity
Increase in CLIC 11.10.93, G. Guignard |
|
216
|
Linear Collider Workshop, SLAC, 13-21 October 1993 3.11.93, PS /DI/Note 93-28, K. HŸbner, W. Schnell |
|
217
|
Investigations of Power and Spatial Correlation Characteristics
of Seismic Vibrations in the CERN LEP Tunnel for Linear Collider Studies 01.12.93, CERN/SL 93-53, V.M. Juravlev, A.A. Sery, A.I. Sleptsov, Protvino, Russia W. Coosemans, G. Ramseier, I. Wilson, CERN |
|
218
|
|
|
219
|
Geometrical alignment of timing of 45¡ pulse train generators
28.06.93 PS/LP/Note 93-40 (Tech.), P.M. Devlin-Hill |