CLIC

Notes 1995

No.
Title/Other Reference/Author/Conference
267
Beam Optics for the CTF 1995
10.01.95, F. Chautard, L. Rinolfi
268
A Design Proposal for Upgrading the CTF Modulators to a Peak Outout Power of 45 MW
15.3.95, P. Pearce
269
CLIC Contribution to the Linac Technology Working Group of the Technical Review Committee
1.3.95 I. Wilson
270
RF Power Requirement for CLIC, (2 x 250 GeV - Single Bunch)
1.3.95, I. Wilson
271
Two Independent Linacs for the Generation of the CLIC Drive Beams
02.3.95, L. Thorndahl
272
Transverse Emittance Control in Linear Colliders
28.3.95, CERN SL/95-14 (AP), G. Guignard
273
Small Crossing-Angle Interaction Region for CLIC: Apertures for the Disrupted Beam
26.6.95, CERN/SL/Note 95-57 (AP), S. Kheifets, B. Zotter
274
Beam Loading Compensation and 30 GHz Power Requirement for Multibunching
26.04.95, L. Thorndahl
275
CTF Developments and Results
2.5.95, CERN/PS 95-11 (LP), R. Bossart, H. Braun, F. Chautard, J.P. Delahaye, J.C. Godot, J.H.B. Madsen, L. Rinolfi, S. Schreiber, G. Suberlucq, I. Wilson, W. Wuensch
276
Tracking Particles with Wake Fields and Space Charge Effects
08.05.95, CERN/PS 95-12 (LP), A. Riche
277
Travel Report, Linear Collider Workshop LC95 27-31 March 1995, Tsukuba (Japan),
08.05.95 AC Note (95-05), K. Hübner
278
Generation of a 30 GHz Train of Bunches using a Magnetic Switch-Yard
15.05.95, CERN/PS 95-19 (LP), B. Autin, R. Corsini
279
Updating of Beam Dynamics in the CLIC Main Linac
08.05.95, CERN/SL 95-23 (AP), G. Guignard
280
A new Family of Isochronous Arcs
08.05.95, CERN/SL 95-24 (AP), E.T. D'Amico, G. Guignard
281
Improved CLIC Performances using the Beam Response for Correcting Alignment Errors
08.05.95, CERN/SL 95-19 (BI), C. Fischer
282
CLIC - A Compact and Efficient High Energy Linear Collider
16.05.95, CERN SL-95-26 (RF), H. Braun, R. Corsini, G. Guignard, C.D. Johnson, J.H.B. Madsen, L. Thorndahl, I. Wilson, W. Wuensch, B. Zotter
283
SLAC/CERN High Gradient Tests of an X-Band Accelerating Section
17.5.95, CERN-SL-95-27 (RF). J.W. Wang, G.A.Loew, R.J. Loewen, R.S. Ruth, A.E. Vlieks, I. Wilson, W. Wuensch
284
Optimization of CLIC Transfer Structure (CTS) Design to meet New Drive Beam Parameters
15.05.95, CERN/SL 95-28 (CO), A. Millich
285
The Practical Limits to Acceptable Beam Loss along the CLIC Drive Linac
19.6.95, C.D. Johnson, P. Kloeppel (CEBAF)
286
Application of D.F. and W.F. Algorithms to the CLIC Main Linac divided in Sectors
30.6.95, C. Fischer, G. Parisi
287
Coherent Radiation in the CLIC Isochronous Ring
07.07.95, S.A. Kheifets
288
Overview of the Program IRCLIC
3.7.95, S.A. Kheifets
289
Kink Instability for Small Crossing Angles
21.7.95, O. Napoly, B. Zotter
290
Recent Results of the CLIC Test Facility
3.10.95, H. Braun
291
Drive Beam Bunchlet Trains for Multibunching
1.11.95, L. Thorndahl
292
First Order Design of a New Type of Isochronous ARC
15.12.95, E.T. D'Amico, G. Guignard
293
The CLIC Test Facilities
01.12.95, CERN/PS/LP 95-49 (LP), CLIC Study Group, Reported by H. Braun, J.P. Delahaye, I. Wilson
LCWS95 Workshop on Physics with Linear Colliders, Iwate, Japan, 8-12 9.95
294
Possible Parameters of Photon Colliders
20.12.95, V. Telnov
 
 
 