
|
No.
|
Title/Other Reference/Author/Conference
|
|
295
|
CLIC/RK-TBA Collaboration Meeting 22.01.96 |
|
296
|
Results
with the CTF in 1995: a summary 26.02.96, K. Aulenbacher, R. Bossart, H. Braun, F. Chautard, E. Chevallay J. Clendenin, R. Corsini, J.P. Delahaye, J. Durand, S. Hutchings, J.H.B. Madsen, J. Mourier, F. Rodriguez, G. Rossat, J. Sladen, G. Suberlucq, J.C. Thomi, L. Thorndahl, I. Wilson, W. Wuensch |
|
297
|
A
3 GHz Photoelectron Gun for High Beam Intensity 31.01.96, PS/RF/Note 95-25, R. Bossart, H. Braun, M. Dehler, J.C. Godot |
|
298
|
Beam
Diagnostics using Coherent Transition Radiation at the CLIC Test Facility 19.04.96, K. Hanke, DESY, K. Aulenbacher, H.H.Braun, F. Chautard, CERN |
|
299
|
Développement
et Production de Photocathodes pour le CLIC Test Facility G. Suberlucq |
|
300
|
CTF Away Days on 11th and 12th March 1996 10.04.96 H.H. Braun for the CTF Team |
|
301
|
Two
352 MHz Push Pull Linac Pairs to Generate Two Drive Beams for
CLIC Multibunch Operation 22.04.96 L. Thorndahl |
|
302
|
CALICO
User's Guide 10.05.96 G. Parisi |
|
303
|
RF
Guns and the Production of Polarized Electrons 01.05.96, NLC Note 20, K. Aulenbacher, R. Bossart, H.H. Braun, J.P. Delahaye, J.H.B. Madsen, G.Suberlucq - CERN, J. Clendenin, G. Mulhollant, J. Sheppard, H. Tang (SLAC) |
|
304
|
CTF2
design report: the CLIC test facility: CTF2 a two-beam
test accelerator for linear collider studies 24.06.96, CERN/PS/96-14 (LP), CLIC Team |
|
305
|
CLIC
Beam Position Monitor Tests 24.06.96, CERN/PS/96-29 (LP), J.P.H. Sladen, I. Wilson, W. Wuensch |
|
306
|
Multibunch
Emittance Preservation in CLIC 24.06.96, CERN/SL/96-27, G. Guignard, J. Hagel (University of Madeira) |
|
307
|
Bunch
Compressor Performances at the CLIC Test Facility 24.06.96, CERN/PS/96-27 (LP), K. Aulenbacher, H.H. Braun, F. Chautard, R. Corsini, J.H.B. Madsen, L. Rinolfi |
|
308
|
Design
Issues of TeV Linear Colliders 24.06.96, CERN/PS/96-30 (LP), J.P. Delahaye |
|
309
|
Design
of an RF Gun for Heavy Beam Loading 24.06.96 R. Bossart, M. Dehler |
|
310
|
Results
from the CLIC Test Facility 24.06.96, CERN/PS/96-28 (LP), K. Aulenbacher, H.H. Braun, R. Bossart, F. Chautard, R. Corsini, J.P. Delahaye, J.C. Godot, S. Hutchins, I. Kamber, L. Rinolfi, G. Rossat, S. Schreiber, G. Suberlucq, L. Thorndahl, I. Wilson, W. Wuensch |
|
311
|
LINCOL
Simulation Description 26.06.96 V. Telnov (INP, Novosibirsk) |
|
312
|
Multibunch
BNS Damping and Wakefield Attenuation in
High Frequency Linacs 09.09.96, CERN/SL/96-60 (AP), G. Guignard, J. Hagel |
|
313
|
CLIC
Test Beam Facilities - Status and Results 09.09.96, CERN/PS/96-33 (LP), I. Wilson |
|
314
|
Design
of the NLC Positron Source 09.09.96, SLAC-PUB-7270, P. Emma, G. Gross, A. Kulikov, Z. Li, R. Miller, L. Rinolfi, H. Tang, J. Turner, D. Yeremian |
|
315
|
Trajectory
Correction Algorithms on the Latest Model of
the CLIC Main Linac 09.09.96, CERN/SL/96-65, C. Fischer, G. Parisi |
|
316
|
Métrologie
linéaire. Ecartométrie biaxiale et fil tendu. 18.09.96 W. Coosemans, H. Mainaud |
|
317
|
Push-Pull
Linac Pairs to Generate Two Drive Beams for CLIC Multibunch
Operation 25.09.96, CERN/PS/96-38 (LP), L. Thorndahl |
|
318
|
CLIC
Waveguide Damped Accelerating Structure Studies 26.09.96, CERN/PS/96-39 (LP), M. Dehler, I. Wilson, W. Wuensch |
|
319
|
A
Code for Multibunched Beams with Wakefields, Group Velocities and
Space Charge 30.09.96, CERN/PS/96-40 (LP), A.J. Riche |
|
320
|
Beam
Dynamics Issues and the CLIC Target Parameters 14.10.96, G. Guignard |
|
321
|
A
Statistical Method to Analyse Wakefield Effects in Linacs with
Application to the CTF2 Drive Beam 14.10.96, CERN/PS/96-42 (LP), S. Fartoukh |
|
322
|
General
Treatment of a Matching Quadrupole Triplet which is Symmetric
around its Median Plane 25.11.96, T.E. D'Amico |