The Compact Linear Collider Study

Organisation & Meetings

For Info:  all related CLIC meetings, Committees and Working Groups are available on Indico site

CLIC Organisation, Activities & Responsibilities (Detailed organigramme)

CLIC-CTF3 Collaboration Board

CLIC Advisory Committee (CLIC-ACE)

CLIC Steering Committee (CSC) & CLIC Accelerator Steering Committee (CASC)

CLIC Conceptual Design Report Editorial Board (CDR)

CLIC Meetings (Minutes: 2009 - 2008 - 2007 - 2006 - 2005 - 2004 - 2003 - before 2003)

CLIC Design & Parameters

CLIC Design Committee

Beam Physics

CLIC Beam Dynamics Meeting

Cost & Schedule

CLIC RF Structure Development

Structure Tests

Technical Design

CTF3 Project

CTF3 Committee

·         CLIC-CTF3 Collaboration Technical Meetings

·         CTF3 Working group Meeting

Commissioning & Operation

CTF3 Operation Committee

Installation & Exploitation

Technical Installation Committee (TIC)

CALIFE

Two Beam Test Stand

TBTS Committee

Test Beam Line (TBL)

Photo Injector

12GHz Test stand

Physics and Detector Studies

Linear Collider Detector project @ CERN 

Physics & Detectors project meetings (indico)

21.03.2011, se