Category: Ctf3 Notes

  • 106

    106 2014 CTF3-Note-106 Commissioning of inductive BPMs in the TBTS probe beam line CTF3-Note-105 Ideas about measuring short range wake fields in accelerating structures for hugh-energy and free-electron laser linear accelerators 2012 CTF3-Note-104 Experimental Results at the CERN Photoemission Laboratory with Co-deposition Photocathodes in the Frame of the CLIC Studies CTF3-Note-103 A Segmented Beam Dump

    Explore →

  • 060

    060 2003 CTF3-Note-060 Analytical Design of a Confocal Resonator CTF3-Note-059 Measurement and Calibration of the Corrector Magnets and the Chicane Dipole Magnets for CTF3 CTF3-Note-058 Studies of OTR Angular Distribution on CTF2 CTF3-Note-057 OTR from Non-Relativistic Electrons CTF3-Note-056 An Inductive Pick-Up for Beam Position and Current Measurements CTF3-Note-055 A New Wide Band Wall Current Monitor

    Explore →

  • 098-091

    098-091 2008 CTF3-Note-091 Optics Design of Transfer Line-2 for CTF3 2007 CTF3-Note-090 Technical Specification for the Supply of a S-Band Variable Attenuator CTF3-Note-089 Cesium-Telluride Photocathode No 166 CTF3-Note-088 Minutes of CTF3/CALIFES meeting held at CERN on 04 April 2007 2006 CTF3-Note-087 Status of 30 GHz High Power RF Pulse Compressor for CTF3 CTF3-Note-086 Automatic Conditioning

    Explore →

  • 076

    076 2006 CTF3-Note-076 Status Report of the CTF3 Test Beam Line CTF3-Note-075 Beam Dynamics and First Operation of the Sub-Harmonic Bunching System in the CTF3 Injector CTF3-Note-074 Beam Dynamics Studies and Emittance Optmization in the CTF3 Linac at CERN CTF3-Note-073 Commissioning Status of the CTF3 Delay Loop CTF3-Note-072 Layout of the Long Optimal Lines in

    Explore →

  • 040

    040 2001 CTF3-Note-040 CTF3 Preliminary Phase Commissioning. Report on Third Week, 29 Oct – 2 Nov 2001 CTF3-Note-039 CTF3 Design Report – Preliminary Phase CTF3-Note-038 Visit to Thales Electron Devices for Klystron Reception (Upgrade of TH2100 SER.No.040, 37 MW to 45 MW), 9.11.2001 CTF3-Note-037 CTF3 Preliminary Phase Commissioning – Report on Second Week, 8-12 Oct

    Explore →

  • 017

    017 2000 CTF3-Note-017 CTF3 Project Information Management Proposal CTF3-Note-016 The Solenoids in the Bunching Section of the LIL CTF3 Injector CTF3-Note-015 Updated Beam Dynamics for CTF3 Injector CTF3-Note-014 Wall Current Monitors for CTF3 CTF3-Note-013 New Measurements of the LIL Bunch Length and Lattice Parameters CTF3-Note-012 Timing for CTF3 Preliminary Phase CTF3-Note-011 Proceedings of the Third

    Explore →