CLIC implementation studies
Implementation studies for the CLIC project are organized around two poles:
1. Civil engineering and infrastructure
- Define and optimize civil works, both underground and at ground level, for housing the CLIC accelerator and detector complex
- Define and optimize technical infrastructure for the CLIC complex
- Identify main environmental impacts and prepare Environmental Impact Study
2. Project Implementation Plan
- Update and maintain project PBS/WBS compatible with revised parameters
- Update value estimates compatible with revised parameters, conduct value engineering of critical cost drivers
- Conduct preliminary safety assessment of the project
- Refine energy and power consumption estimates, identify and develop actions towards energy and power efficiency.
Recent publications and talks:
Challenges of high-energy particle accelerators, from electromagnetism to geosciences by Ph. Lebrun & P. Garbincius, Geneva, 2015
Why are particle accelerators so inefficient? by Ph. Lebrun, CERN, 2014
Energy consumption and savings potential of CLIC by Ph. Lebrun, HF2014
Paths to CLIC power and energy efficiency by Ph. Lebrun, CLIC Workshop 2014
From LHC to CLIC and FCC: some common issues in the study of future large accelerator projects by Ph. Lebrun, CLIC Workshop 2014
CLIC CDR Schedules & Value Estimates by Ph. Lebrun, CLIC Workshop 2013
Civil Engineering Studies for Major Projects after LHC by J. Osborne et al., IPAC 2011
Assessing Risk in Costing High-energy Accelerators: from Existing Projects to the Future Linear Collider by Ph. Lebrun & P. Garbincius, IPAC 2010
Activity Leader: