CTF3-notes

2003

CTF3-Note-060 Analytical Design of a Confocal Resonator

CTF3-Note-059 Measurement and Calibration of the Corrector Magnets and the Chicane Dipole Magnets for CTF3

CTF3-Note-058 Studies of OTR Angular Distribution on CTF2

CTF3-Note-057 OTR from Non-Relativistic Electrons

CTF3-Note-056 An Inductive Pick-Up for Beam Position and Current Measurements

CTF3-Note-055 A New Wide Band Wall Current Monitor

CTF3-Note-054 Report on the Third Operation of the CTF3 Preliminary Phase in 2002, 16 Sep - 25 Oct

CTF3-Note-053 Hardware of the CTF3 Beam Position Measurement System

2002

CTF3-Note-052 Report on the Second Operation Period of the CTF3 Preliminary Phase in 2002, 27 May - 23 Aug

CTF3-Note-051 A 50 Hz Low-Power Solid-State Klystron-Modulator

CTF3-Note-050 Bunch Compression with the First Chicane for Linac RF Power Source

CTF3-Note-049 Report on the Operation of the CTF3 Preliminary Phase, 8 Apr-24 May 2002

CTF3-Note-048 A High Performance Diode-Pumped Nd:YLF Amplifier

CTF3-Note-047 CTF3 Design Report

CTF3-Note-046 Design of a Bunch Phase Monitor for the CTF3 Preliminary Phase

CTF3-Note-045 PILOT Test Preparation

CTF3-Note-044 CTF3 Preliminary Phase Commissioning, Report on Fifth and Sixth Weeks, 3-14 Dec 2001

CTF3-Note-043 CTF3 Preliminary Phase Commissioning, Report on Fourth Week, 12-16.11.2001

CTF3-Note-042 CTF3 Project Review, 2-4.10.2001

CTF3-Note-041 Prototype "froid" WCM CTF3 : quelques résultats