Tag: CLIC

  • EV work packages

    EV work packages List of work packages CLIC Experimantal Verification: Work package Work package holder CTF3 Consolidation & Upgrades F. Tecker Drive Beam phase feed-forward and feedbacks P. Skowronski TBL+, X-band high power RF production & structure testing S. Doebert Two-Beam module string, test with beam W. Farabolini Drive-beam front end facility S. Doebert Modulator

    Explore →

  • CLIC experimental verification

    CLIC experimental verification The objective of the Experimental Verification activity is to conduct system tests at CERN and elsewhere – in most cases with beams – in order to validate the CLIC scheme and provide feedback to design and hardware development studies. The main activity is centered on the CLIC Test Facility CTF3, built at

    Explore →

  • 106

    106 2014 CTF3-Note-106 Commissioning of inductive BPMs in the TBTS probe beam line CTF3-Note-105 Ideas about measuring short range wake fields in accelerating structures for hugh-energy and free-electron laser linear accelerators 2012 CTF3-Note-104 Experimental Results at the CERN Photoemission Laboratory with Co-deposition Photocathodes in the Frame of the CLIC Studies CTF3-Note-103 A Segmented Beam Dump

    Explore →

  • 098-091

    098-091 2008 CTF3-Note-091 Optics Design of Transfer Line-2 for CTF3 2007 CTF3-Note-090 Technical Specification for the Supply of a S-Band Variable Attenuator CTF3-Note-089 Cesium-Telluride Photocathode No 166 CTF3-Note-088 Minutes of CTF3/CALIFES meeting held at CERN on 04 April 2007 2006 CTF3-Note-087 Status of 30 GHz High Power RF Pulse Compressor for CTF3 CTF3-Note-086 Automatic Conditioning

    Explore →

  • CTF3 general description

    CTF3 general description The CLIC Test Facility 3 (CTF3) is primarily a scaled version of the CLIC drive beam complex. It produces the high-current drive beam that generates the 12 GHz RF power for the CLIC accelerating structures. CTF3 first accelerates a 4 A beam up to 120 MeV, in a fully loaded linac with

    Explore →

  • 040

    040 2001 CTF3-Note-040 CTF3 Preliminary Phase Commissioning. Report on Third Week, 29 Oct – 2 Nov 2001 CTF3-Note-039 CTF3 Design Report – Preliminary Phase CTF3-Note-038 Visit to Thales Electron Devices for Klystron Reception (Upgrade of TH2100 SER.No.040, 37 MW to 45 MW), 9.11.2001 CTF3-Note-037 CTF3 Preliminary Phase Commissioning – Report on Second Week, 8-12 Oct

    Explore →

  • CTF3

    CTF3

    CTF3 stopped its operation at the end of 2016 after successfully completing its programme. Analysis of data and results are still on-going and will be an integral part of the CLIC project plan by the end of 2018. Some future measurements for CLIC will take place using the new user facility CLEAR.

    Explore →

  • 017

    017 2000 CTF3-Note-017 CTF3 Project Information Management Proposal CTF3-Note-016 The Solenoids in the Bunching Section of the LIL CTF3 Injector CTF3-Note-015 Updated Beam Dynamics for CTF3 Injector CTF3-Note-014 Wall Current Monitors for CTF3 CTF3-Note-013 New Measurements of the LIL Bunch Length and Lattice Parameters CTF3-Note-012 Timing for CTF3 Preliminary Phase CTF3-Note-011 Proceedings of the Third

    Explore →

  • CLIC organogram

    CLIC organogram

    CLIC organogram

    Explore →

  • CLIC accelerator activities

    CLIC accelerator activities Main activities and goals for 2018: CLIC Parameters and design CLIC Linac systems CLIC Technical developments CLIC X-band technologies Other activities before 2017: CLIC Experimental verification CLIC Implementation studies

    Explore →