Each spent drive beam will already have lost 90% of its power in the PETS. After each of the 48 decelerating sectors the drive beam must be bent away from the linac, leaving enough space for a new drive beam to be injected to the next sector. The old beam is bent away using a dipole magnet, into a beam dump about 20 m away. The power to be absorbed per dump is 0.5 MW.