CTF3-notes

2001

CTF3-Note-040 CTF3 Preliminary Phase Commissioning. Report on Third Week, 29 Oct - 2 Nov 2001

CTF3-Note-039 CTF3 Design Report - Preliminary Phase

CTF3-Note-038 Visit to Thales Electron Devices for Klystron Reception (Upgrade of TH2100 SER.No.040, 37 MW to 45 MW), 9.11.2001

CTF3-Note-037 CTF3 Preliminary Phase Commissioning - Report on Second Week, 8-12 Oct 2001

CTF3-Note-036 Report on the Photo-injector Workshop, CERN, 24-25 Sep 2001

CTF3-Note-035 Specification for the Supply of a 1.5 GHz Broadband Klystron or other RF Power Source for the CLIC Test Facility (CTF3)

CTF3-Note-034 CTF3 Preliminary Phase Commissioning - Report on First Week, 17-21 Sep 2001

CTF3-Note-033 Technical Specification for Solenoid Magnets MS 464 for the CTF3 Injector

CTF3-Note-032 The Effect of Different Resistor Values on the CTF3 Sub-harmonic Klystron Pulser Simulation Circuit Performance

CTF3-Note-031 Magnets and Power Supplies Nomenclature for the Preliminary Phase of CTF3

CTF3-Note-030 Notes of a Visit to TMD Technologies Ltd. on 02.08. 2001

CTF3-Note-029 Report of the Meeting for CLIC Photo-injector Study, 28 Jun 2001

CTF3-Note-028 Specifications for the CTF3 Gun

CTF3-Note-027 Visit to Thales Electron Devices (formerly Thomson Tubes Electronique), 26th Jun 2001

CTF3-Note-026 Energy Spread and Energy Losses in CTF3 Combiner Ring

CTF3-Note-025 The RF Deflectors for CTF3

CTF3-Note-024 Combiner Ring Lattice

CTF3-Note-023 Driving Beam Delay Loop Design for CTF3

CTF3-Note-022 RF Power Testing of the Two RF Deflectors for the Preliminary Phase of the New CLIC Test Facility (CTF3)

CTF3-Note-021 Proposal for CTF3 Timing System

CTF3-Note-020 Production of a High Average Current Electron Beam with Cs-Te Photocathodes

CTF3-Note-019 Thermal Analysis of OTR Screens for CTF3

CTF3-Note-018 LIL Lattice Parameters, LIL Energy Gains, LIL Temperature versus RF Frequency, EPA Circumference and EPA Isochronicity Measurements